- Set Top Box[6]
- Projectors[6]
- Temperature Instruments[6]
- Counters[6]
- Voltage Meters[6]
- Energy Meters[6]
- Frequency Meters[6]
- Auto Meter[1]
- Sensors[6]
- Relays[6]
- Auto Relays[1]
- Timers[6]
- Other Electrical Instruments[1]
- Other Measuring & Analysing Instruments[1]
- Power Meters[6]
- Inverters & Converters[6]
- Instrument Parts & Accessories[6]
- Other Electronic Components[2]
- Other Motor Accessories[3]
- Contact Person : Mr. Lai Tony
- Company Name : Dongguan Lionpower Electronic Co., Ltd.
- Tel : 86-769-85338950
- Fax : 86-769-85328216
- Address : Guangdong,DongGuan,3rd Floor,A Building,HongSheng Industrial Zone, DongDa 3rd Street, Sha Tou Chang An Town, DongGuan, GuangDong Province, China, 523850
- Country/Region : China
- Zip : 523850
Related Product Searches:Multi-function counter,High Quality,Multi-function counter, Digital counter,DM48
Multi-function counter
Feature
1. Mounting size:W45*H45mm
2.power supply;220VAC/110VAC 50/60HZ
3. Backup data for power fail.
4. Multi-function intelligent meter, used as counter frequency meter,
speed meter etc. by pressing four key(32 type).
5. Main fold relay output fashion.
6.Operation temperature 0-50°C,
7.Consumption about 3AV.
8.Insulation strength DC500V 20MΩ
9.Insulation strength AC2000V 1min.
Model and parameter,
1.Counting signal Impedance more than 100KΩ
Input level H more than 5V; L less than 2V
Max. Input 50V
Step descend edge.
2.Contact content AC250V 3A;
3. Noise elimination ratio more than NMR 40dB (50Hz/60Hz) ±10%.
4.Over range indication digital flashing.
Ralay action details
Relay action details(function code:XY-Z). | 1 | Device start to work after power on when reach to SV,Relay NC. | ||||||||||
2 | Device doesn't work after power on(press reset to start working)after reachtoSV Relay NC. | |||||||||||
3 | Device start to work after power on when reach to SV,Relay No. | |||||||||||
4 | Device doesn't work after power on(press reset to start working)after reachtoSV Relay No. | |||||||||||
5 | Device start to work after power on when reach to SV,Relay NC.After 5s device reset and start to work all over again | |||||||||||
6 | Device doesn't work after power on(press reset to start working)after reachtoSV Relay NC.After 5s device reset and start to work all over again |
5.ISO9001:2000 standard
.
Multi-function counter